8,432 Active Recruiters     Over 2 Million Candidates Globally

Advanced
  1. Keep me logged in
  2. forgot password
cancel

Checkout Jobs Basket (0)

You can checkout a maximum of 150 jobs.

Signup Better for Candidates

  • Create a free virtual CV and let recruiters find you
  • Automatically have your profile matched to suitable Oil & Gas positions
  • Link to your profile using it as a free online CV
  • Store all your employment documents to your profile for easy sending
  • Always receive feedback on positions applied for

Signup Better for Recruiters

  • Suitable candidates automatically matched to your position
  • View candidate profiles for free
  • No more waiting for candidates to respond to job advertisements
  • Only ever pay when you match a candidate to a position
  • No more cold calling and sorting through out dated CVs

First Cross-Border North Sea Field Brought Online by Equinor

Published in Oil Industry News on Tuesday, 17 September 2019


Graphic for News Item: First Cross-Border North Sea Field Brought Online by Equinor

Norway’s Equinor has started production at the Utgard gas and condensate field, which straddles British-Norwegian border in the North Sea, the energy company said on Tuesday.

The 40 million barrels of oil equivalents (boe) field is expected to reach daily output of around 43,000 boe at plateau, it added.

Equinor is the field’s operator, while Poland’s Lotos and Kuwait’s KUFPEC also hold stakes. (Reporting by Nerijus Adomaitis, editing by Terje Solsvik)

The field development consists of two wells from a subsea template tied back to the Sleipner field by a pipeline and an umbilical. The template is installed on the Norwegian side of the border, with one well on each side.

The field was discovered in 1982 and a development has been considered several times. In 2016, Equinor acquired the UK share of the discovery to realize the development, which has become a profitable project even with substantially lower oil prices than we see today.

The plan for development and operation and the field development plan were submitted to Norwegian and UK authorities in 2016. At that time the cost estimate was NOK 3.5 billion (fixed NOK), and start-up was scheduled for the end of 2019.

“I am proud of the Utgard project being delivered at NOK 900 million below the cost estimate and ahead of schedule, but first and foremost of the project being delivered without personal injuries,” said Anders Opedal, executive vice president for Technology, Projects and Drilling in Equinor.

It is the first time Equinor leads a field development for recovering resources across the border between the Norwegian and UK continental shelves.

Hot Tip

Oil and Gas People gives recruiters a live snapshot of the current oil and gas workforce and its availability. Update your profile every 60 days to stay visible to recruiters as actively looking. Better for candidates.. Better for recruiters..

“Good and efficient cross-border cooperation with both license partners and authorities has made the Utgard development possible, and I am pleased that we found solutions ensuring proper resource management on both sides,” said Opedal.

“Through Utgard, we are maximizing economic recovery from the North Sea, and unlocking high value, low carbon intensity barrels in line with our strategy. We will continue to seek cross-border opportunities to add value on both sides of the border,” stated Arne Gürtner, senior vice president for UK and Ireland Offshore in Equinor.

Utgard will be remote-operated from the Norwegian Sleipner field, where the well stream will be processed before dry gas is transported to the market through the Gassled pipeline system, and liquids are sent through the existing pipeline to Kårstø for further export to Europe. Utgard will also utilize Sleipner’s facility for CO2 purification and storage.

Hot Tip

Thousands of recruiters use oilandgaspeople.com to post jobs and find suitable candidates. We are the industry’s most popular job and news site. If you are in the market for a new job you need to have a profile on our site.

“By reusing the existing infrastructure, we can, with relatively low investments, realize smaller discoveries that would not otherwise have been profitable enough to develop. At the same time, we are adding valuable volumes to Sleipner,” said Arne Sigve Nylund, executive vice president for Development and Production Norway in Equinor.

Equinor Energy is the operator of the field with a 38.44% interest and Equinor UK Limited also holds a 38.44% interest. Other partners are LOTOS Exploration & Production Norge (17.36%) and KUFPEC Norway (6.2%).

The field’s expected lifetime is beyond 2025.





Tags

Oil Field, North Sea, Oil and Gas Production








Oil and Gas News Archive


Latest Oil & Gas News







Featured Companies

  • View All JobsOMPA

    Offshore Marine People & Academy (OMPA) is a global provider of personnel and training to the renewables, oil & gas, telecommunications and marine industries.

    With over 15 years' industry experience, we work with candidates to match them to the right roles and equip them with the skills and knowledge needed to succeed. Our job is to exceed your expectations.

    Visit us online: offshorempa.com

  • View All JobsChronos Oil and Gas

    Chronos Oil and Gas is one of the fastest growing and best placed recruitment agencies in the sector.

    With over 300,000 candidates on our database and an international team of specialist recruiters we work with clients to staff major projects around the world.

    Register your CV at www.chronosoilandgas.com

  • View All JobsNatural Resources

    Natural Resources is a UK based recruitment company providing personnel of all disciplines and nationalities worldwide.

    We represent clients and candidates at all levels who operate globally within oil & gas, renewables, nuclear, power, mining, marine, drilling, construction and petrochemicals. Our client base includes energy and construction.

    Visit Natural Resources at natural-resources.com