Hook UP & Commissioning PLANNER
Add to Jobs Basket
You can apply for up to 10 jobs at once by adding them to your basket.
Application Limit
Candidates can apply for up to 150 jobs in 28 days.
Engineering > Planning / Scheduling
Status: Expired
To work for an Oil Company on a large gas Platform project due to go into production in mid 2013 in Asia. In order to be shortlisted, it is Essential that you provide details of some of your previous employment history when applying via this jobsite.
Job Details
Location: Korea, South > Ulsan
Salary: USD Dayrate net of Tax + various allowances: local transport: leave breaks
Working Locations: Site, Office, Offshore, International
Posted: 06/09/2011 05:00:00
Expires: 04/10/2011 05:00:00
Key Requirements
· Bachelors Degree (may not be essential).· Minimum 10 years experience in the offshore oil & gas industry with at least 8 years with experience of offshore facilities for Pre-Commissioning, Hookup & Commissioning scheduling - this is CRITICAL.
· Knowledge of computer based planning tools, e.g. Primavera P6 / MS Project ect. Including Microsoft suite e.g. Excel, Word, Access and Power Point.
· Experience in Project Start-up sequence logic planning
· Hold current offshore Survival Certificate
· Familiar with the operational aspects of offshore production and platform facilities, offshore operations and operation of Drilling Rigs. This aspect is preferred but is not a essential for this position.
· Possess good communication skills and good command of English, both verbal and written
Job Description
· Take the responsibility for Contractor’s schedule development, maintenance of all Pre-Commissioning, Hookup & Commissioning and operations interface related to the work for Topsides, Drilling, Onshore Gas Terminal, Subsea Pipelines and Umbilical’s encompassing Contractors Commissioning Scope of Work.· To work on site and offshore to assist in scheduling the interfaces between discipline activities and with other project team members.
· Responsible to the Commissioning Manager and reporting to the Senior Project Planner for ensuring the integration management and control of the Contractor’s Project Pre-Commissioning and Commissioning Schedule that they are properly planned, measured and accurately reported in line with the Project Schedule.
· Establish target schedule and S’ curves by discipline and overall for execution of module Commissioning scope, Construction milestones and priorities for system/sub-system handover to Operations.
· Identify and maintain Contractor’s interface milestones for the Commissioning Schedule including Construction, Drilling, Commissioning and Start Up for the Topside, the Accommodation Unit, the Onshore Gas Terminal, the Subsea activities and operations.
· Help Contractor to develop and maintain an integrated Level 3 schedule from Construction Hand over through to the Pre-Commissioning, Commissioning, Offshore HUC, Start Up and Hand over to Operations for Final Acceptance.
· Constant Monitor the Contractor’s Commissioning works for progress and ensure resources are deployed to achieve the project plan and ensure plans are tracked and reported. Evaluating, analyzing, highlighting and offering solutions to trends that may result in schedule slippages.
· Review Contractor’s Construction, Subcontractor, Vendor schedules and manpower requirements in line with Commissioning requirements and liaise with Project Construction and Senor Planner and ensure schedule impacts are dealt with.
· Provide assistance with the management of all Contractor’s Commissioning activities associated with project planning, scheduling, forecasting, critical path analysis, progress reporting, and time recovery strategies.
· Review the Contractor’s reported status of Construction completion milestones, assess the impact to the Commissioning works and provide an input to remedial action to the Contractor and Commissioning teams. Establish and monitor Contractor’s weekly KPI Commissioning rates including loop checks, hydro tests and system tests. Produce reports as required for the Project Commissioning Manager.
· Working with the Commissioning Manager and Commissioning Team, establish a productivity measurement system to measure Contractor’s actual performance and improve performance to shorten the critical path.
· Be pro-active in all matters relating to Planning and Risk Analysis.
· Perform any other duties that may be requested by the Project Manager and the Senior Project Planner.
Similar Jobs to Hook UP & Commissioning PLANNER
LivePiping Layout Engineer
Korea, South > SeoulEngineering > Piping
Key Requirements
888700 - Piping Layout Engineer
Our Client are currently recruiting for a Piping Layout Engineer, to be based initially in Korea, and there after Norway.Job Description
888700 - Piping Layout Engineer
Our Client are currently recruiting for a Piping Layout Engineer, to be based initially in Korea, and there after Norway.
Job Description
- Follow up engineering solutions within layout.
- Assure QA / QC, progress according to the companys requirements.
Skills and Experience
- Extensive experience within piping and layout, from oil and gas construction projects, preferrably international.
This is a contract position.
The rate for this position is negotiable.
If you feel that you are well suited to the above opportunity and would like to find out more then please contact Orion Group for more information or apply by forwarding your current CV quoting reference 888700 .
Orion Group currently supplies over 3,500 personnel in roles including Oil & Gas, Renewables, Power & Utilities, Construction, Mining, Rail, Aerospace, IT & Telecoms, Office and Commercial. With 29 offices worldwide, Orion Group operate in the UK and internationally and in January 2009, were named the UK's number one for engineering recruitment.
Type: Short Term Contract / InternationalSalary: negotiable
888700 - Piping Layout Engineer
Our Client are currently recruiting for a Piping Layout Engineer, to be based initially in Korea, and there after Norway.Posted: Thu 23 May at 16:00 Expires: Thu 20 Jun at 16:00
LiveLead Mechanical Design Engineer- Power Plant
Korea, South > SeoulEngineering > Construction
Key Requirements
*Master or Bachelor Degree of Mechanical Engineer.
*Minimum 15 years of experience with and/or in power plant engineering area as a lead engineer or engineers in reputed power plant engineering company.
*Engineering experience of over 600 MW coal- fired super critical thermal power plant as a lead engineer will be preferred.
*Should have successfully executed minimum three power plants as a lead engineer with a capacity of 300 MW or greater.
*Strong knowledge of power plant basic and detail engineering deliverables including P&ID development is must.Job Description
Lead Mechanical Design Engineer- Power Plants One of the Leading International EPC contractors looking for a Lead Mechanical Engineer, to be based in their offices in Seoul, South Korea. The Lead Mechanical Lead Engineer position will lead all kind of mechanical and process engineering work for power plant including coal or oil- fired steam power plant and/or combined cycle power plant for bidding proposal or execution project. Position will serve as a primary interface with other engineering team (such as piping, electric, control & instruments, civil, etc) and project team and clients, ensuring delivery of high-quality engineering output within established budgets and timelines. Requirements *Master or Bachelor Degree of Mechanical Engineer. *Minimum 15 years of experience with and/or in power plant engineering area as a lead engineer or engineers in reputed power plant engineering company. *Engineering experience of over 600 MW coal- fired super critical thermal power plant as a lead engineer will be preferred. *Should have successfully executed minimum three power plants as a lead engineer with a capacity of 300 MW or greater. *Strong knowledge of power plant basic and detail engineering deliverables including P&ID development is must. *Lead value engineering sessions for cost optimization to improve the system design *Should work closely with and directing a team of senior/junior mechanical engineers to ensure supervision and monitoring of all mechanical plant and equipment works for entire power plant. *Ability to manage & lead culturally perse group(s) and bridge communication gaps *Good verbal and written communication skills and ability to work remotely with offices within the region *Commissioning supervision experience will be preferred. *Must be very flexible, able to learn independently and communicate well with a cross-functional team.
Type: Long Term Contract / InternationalSalary: $150000 - $190000 per annum + Negotiable
One of the Leading International EPC contractors looking for a Lead Mechanical Engineer, to be based in their offices in Seoul, South Korea. The Lead Mechanical Lead Engineer position will lead all kind of mechanical and process engineering work for power plant including coal or oil- fired steam power plant and/or combined cycle power plant for bidding proposal or execution project.Posted: Thu 09 May at 11:00 Expires: Thu 06 Jun at 11:00
LiveSenior Mechanical Engineer
Korea, South > InchonEngineering > Mechanical
Key Requirements
95685 - Senior Mechanical Engineer
Our client is one of the world's largest energy companies employing over 80,000 personnel and operating in over 100 countries worldwide with expertise covering a range of energy sources.
They are currently recruiting for the position of Senior Mechanical Engineer, based in South Korea.Job Description
95685 - Senior Mechanical Engineer
Our client is one of the world's largest energy companies employing over 80,000 personnel and operating in over 100 countries worldwide with expertise covering a range of energy sources.
They are currently recruiting for the position of Senior Mechanical Engineer, based in South Korea.
Job Description
Responsible to prepare detailed engineering designs and coordinate all phases of planning and drilling a well Ensure the geological and reservoir objectives of the well are met while assuring the highest standards of engineering integrity, safety, and environmental protection are applied to the design and execution of the well. Prepare and review designs and well plans representing the highest integrity execution and optimal costs and investments for the proposed wells. Mentor less experienced engineers in deepwater well design and operations
- Preparation of cost estimates for selection of optimal alternatives
- Material and equipment selection and evaluation
- Government regulatory requirements, approvals and permits
- Technical bid preparations and analysis
- Detailed well planning
- Work closely with other groups to assure the program is based on all available geological and reservoir information and drilling information from other wells in the area
- Surveillance of daily operations to insure the program is conducted to apply best technology and proposed modifications if applicable
- Analyze performance as required
- Assist to implement changes in the procedures and equipment based on results of analysis
- Provide onsite drilling and completion surveillance and engineering assessments and present recommendations to Operations Superintendent on critical activities and problems (as required during execution phase)
- Provide onsite surveillance and technical assistance on special projects, equipment testing and new procedures
Skills & Experience
- Extensive minimum well construction experience
- Considerable experience is required in international developments
- Highly developed communication skills and proficient in typical Microsoft computer based applications
- Minimum BSc degree in engineering
- Proficient in the operating and construction characteristics of all components utilized in the drilling system and be knowledgeable about alternative systems and procedures which might be implemented to improve operational efficiency
- Prior employment with major Operator, Service Company, or Drilling Contractor
- Read, write and speak fluent English
This is a contract position.
The rate for this position is negotiable.
If you feel that you are well suited to the above opportunity and would like to find out more then please contact Orion Group for more information or apply by forwarding your current CV quoting reference 95685.
Orion Group currently supplies over 3,500 personnel in roles including Oil & Gas, Renewables, Power & Utilities, Construction, Mining, Rail, Aerospace, IT & Telecoms, Office and Commercial. With 29 offices worldwide, Orion Group operate in the UK and internationally and in January 2009, were named the UK's number one for engineering recruitment.
*LI-WRAP
Type: Short Term Contract / InternationalSalary: Negotiable
95685 - Senior Mechanical Engineer
Our client is one of the world's largest energy companies employing over 80,000 personnel and operating in over 100 countries worldwide with expertise covering a range of energy sources.
They are currently recruiting for the position of Senior Mechanical Engineer, based in South Korea.Posted: Fri 26 Apr at 13:00 Expires: Fri 24 May at 13:00





