Operations (other) (Survey) positions sought by Candidate #42815284 from United Kingdom
Looking For
| Operations (other) > Survey |
|---|
| Management > Exploration |
| Survey > Surveyor |
| Survey > Geomatics Engineer |
Job Requirements
| Item | Value |
|---|---|
| Min Salary: | None specified |
| Min Day Rate: | None specified |
| Willing to Work: | Site Office International |
| Will Accept: | Long Term Contract Staff |
| Country of Residence: | UK |
| Authorised to Work: | Europe |
| Desired Location(s): |
Africa Asia Central America and the Caribbean Europe Middle East North America Oceana (Australia) South America |
| Countries Candidate Doesn't Wish To Work In: | None specified |
Qualifications
| Qualification | Gained |
|---|---|
|
Chartered or equivalent Fellow RICS |
2001 |
|
RICS or equivalent Fellow |
2001 |
|
Chartered or equivalent Fellow Inst Civil Engineering Surveyors |
2000 |
|
City and Guilds or equivalent AutoCad |
1993 |
|
Bachelors Degree Hons or equivalent Land Surveying Sciences |
1977 |
| City and Guilds or equivalent |
Languages
| English |
|---|
Employment History
Hover job titles for more details.
Current position available after purchase and to Unlimited recruiters. Upgrade now.
Technical Director (Dec 05 - Feb 10)
Dec 2005 - Feb 2010
Jacobs
United Kingdom
Operations (other): Survey
A chartered land surveyor engaged in the Geomatics business unit of a large engineering consultancy and design organization. Over 30 years experience in the field of surveying that includes management of survey teams, contracts, preparation of specifications, technical and financial proposals, and supervision of progress and quality of contractor’s work in the UK, Africa, Middle and Far East....
Principal Surveyor (Oct 04 - Feb 05)
Oct 2004 - Feb 2005
Halliburton-KBR
Egypt > Hurghada
Operations (other): Surveyor
Oct 2004- Feb 2005 Principal Surveyor, Saqarra 18”Oil Pipeline. Egypt A project to design and construct a pipeline from an oil field in the Red Sea to onshore processing facility. Developed scope and specification for ground and bathymetric surveys to allow design of offshore pipeline to come onshore to processing facility. Reviewed corridor r.o.w and setting out of centreline against exi...
Principal Surveyor (Dec 02 - Dec 03)
Dec 2002 - Dec 2003
Halliburton-KBR
United Arab Emirates > Abu Dhabi
Operations (other): Surveyor
Nov 2002-Jan 2003 Principal Surveyor, Dolphin Energy Ltd- Abu Dhabi A project for the design of the land fall of a gas pipeline to onshore processing facility. Jo was engaged on-site in a data gathering exercise for 48” gas pipeline, determined land fall site and alignment to tie-in into existing gas pipeline network. Worked closely with client, planning authorities, power supply and util...
Principal Surveyor (Jun 97 - Apr 99)
Jun 1997 - Apr 1999
Halliburton-KBR
Kazakhstan
Operations (other): Surveyor
Responsible for the preparation of technical and financial proposals, which varied from inputs to conceptual design and front-end engineering for oil and gas field developments around the NE Caspian Sea, to oil and water pipelines, railway lines and gravimetric surveys in North Africa to hydropower schemes in West Africa.
Senior Surveyor (Jan 89 - Oct 94)
Jan 1989 - Oct 1994
Halliburton-KBR
Libya > Tripoli
Operations (other): Surveyor
The Great Man-made River Project (GMRP) was a major water supply project covering a large area of Libya. The project will deliver 6.18 million m3 of water a day through 4m diameter pipes by gravity and pumping from desert aquifers to municipal and agricultural users along the coastal plain
Availability
| Item | Value | |
|---|---|---|
|
Notice Required: 1 weeks Available from: 12/02/2012 |
||
Training & Certification
| Qualification | Gained/Expired |
|---|---|
| None specified | |
Industry Experience
| Industry Area | Experience |
|---|---|
| Operations (other) - Surveyor | 30 Yrs |
| Operations (other) - Survey | 25 Yrs |
| IT/Communications - GIS/Remote Sensing | 10 Yrs |
| Management - Project Management/Coordination | 5 Yrs |
Project Experience
| Project Type | Experience |
|---|---|
| Non Oil and Gas | 20 Yrs |
| Desert Projects | 10 Yrs |
| Onshore Pipelines | 9 Yrs |
| Offshore Pipelines | 1 Yr |
| Seismic | 1 Yr |
Additional Employment Documents
| Document |
|---|
| None specified |

