Survey (Party Chief) positions sought by Candidate #422305494 from Rome, Italy
Looking For
| Survey > Party Chief |
|---|
| Survey > Survey Client Rep |
| Engineering > Construction - Subsea |
| Engineering > Pipeline |
Job Requirements
| Item | Value |
|---|---|
| Min Salary: | None specified |
| Min Day Rate: | £350 |
| Willing to Work: | Site Office Offshore International |
| Will Accept: | Short Term Contract Long Term Contract Staff |
| Country of Residence: | IT |
| Authorised to Work: | Europe |
| Desired Location(s): |
Africa Asia Central America and the Caribbean Europe Middle East North America Oceana (Australia) South America |
| Countries Candidate Doesn't Wish To Work In: | None specified |
Qualifications
| Qualification | Gained |
|---|---|
|
Other LEICA Positioning GPS Course |
2004 |
|
Other EIVA Navipac Course |
1996 |
|
Diploma or equivalent Engineering and Survey high school |
1991 |
Languages
| English, Spanish, French, Italian |
|---|
Employment History
Hover job titles for more details.
Current position available after purchase and to Unlimited recruiters. Upgrade now.
Project: ANNAMARIA GAS FIELD (Feb 09 - Feb 10)
Feb 2009 - Feb 2010
MSS Spa - Saipem
Croatia > Rijeka
Survey: Party Chief
Subsea Positioning of IKA A-AnnamariaA 16” Pipeline Subsea Positioning of AnnamariaB-AnnamariaA 16” Pipeline Subsea Positioning of AnnamariaB-Brenda 18” + 3” Pipeline Installation of Boat Landing on Annamaria B platform Subsea Installation of Mattresses on Brenda Platform location Procedure and standards for Subsea Sealine Positioning USBL and W ROV C.P.L.B Crawler Barge Surface posi...
Project: Baraka 12” Sealine Installation – Tunis -BG (Jan 09 - Dec 09)
Jan 2009 - Dec 2009
MSS
Tunisia > Monastir
Survey: Party Chief
Project: Baraka 12” Sealine Installation – Tunis Survey Party Chief • Surface Positioning of Baraka 12” sealine • Subsea Positioning of 12” sealine - USBL System Procedure and standards for Sealine Positioning
Project: Maamoura Jacket Installation - Tunis (Feb 08 - Apr 08)
Feb 2008 - Apr 2008
MSS Spa - Saipem
Tunisia > Monastir
Engineering: Construction
Supplied the following services.: Procedure and standard for Transportation, Subsea Positioning and Installation of Maamoura Jacket and Top Side Procedure and standards for Surface and Subsea positioning USBL System and ROV and legs cut off C.P.L.B Crawler Barge Surface positioning, anchor mooring and Tugs positioning
Project: Maamoura 10” Sealine Installation – Tunis (Jan 08 - Dec 08)
Jan 2008 - Dec 2008
MSS Spa - Saipem
Tunisia > Monastir
Survey: Party Chief
Shore Pull of Maamoura 10” and Baraka 12” sealine Surface Positioning of Maamoura 10” Sealine Subsea Positioning of 10” sealine - USBL System Procedure and standards for Sealine Positioning USBL System and ROV C.P.L.B Crawler Barge Surface positioning, anchor mooring and Tugs positioning
Project: Hasdrubal Pipe Lay 18” - Tunis (Mar 07 - Jan 08)
Mar 2007 - Jan 2008
MSS Spa- Saipem
Tunisia > Monastir
Survey: Party Chief
Shore Pull of Hasdrubal 18” sealine Surface Positioning of CPLB Crawler Barge Subsea Positioning of 18” sealine - USBL System and ROV Procedure and standards for Sealine Positioning USBL System and ROV Anchor mooring and Tugs positioning
Project: PILES & FLARE Fabrication, Assembly and Installation (Apr 06 - Oct 07)
Apr 2006 - Oct 2007
GAS Srl - Agip KCO
Kazakhstan > Almaty
Engineering: Construction
Caspian Sea – Island D. Supplied the following services.: Construction & Installation procedure and standards and installation work specifications for Subsea and Surface positioning. Positioning and Grounding of Construction Barge ERSAI-1: Support with G.P.S. R.T.K. and Total Station for all grounding procedures. Pile Guides Inspection and Installation Foundation Piles Installation S...
Project: AIOC A.C.G. Azeri-Chirag-Gunashli Project (Mar 02 - Oct 07)
Mar 2002 - Oct 2007
MSS Spa - SAIPEM
Azerbaijan > Baku
Engineering: Construction
Installed oil platforms in the Caspia Sea (Azerbaijan - A.C.G. Project). Supplied the following services.: Construction & Installation procedure and standards and installation work specifications for Jacket, Template and Top-Sides Positioning, Installation and Transportation Construction barge Anchor Mooring Procedure for Jackets Legs cut-off Calibration of navigation instrumentations...
Availability
| Item | Value | |
|---|---|---|
|
Notice Required: 3 weeks Available from: 02/03/2012 |
||
Training & Certification
| Qualification | Gained/Expired |
|---|---|
| Valid UK Survival | Expires: 29/09/2010 |
| Valid Offshore Medical | Expires: 26/09/2010 |
| bosiet huet |
Industry Experience
| Industry Area | Experience |
|---|---|
| Engineering - Construction | 10 Yrs |
| Survey - Party Chief | 10 Yrs |
| Engineering - Construction - Subsea | 10 Yrs |
| Survey - Survey Engineer | 10 Yrs |
Project Experience
| Project Type | Experience |
|---|---|
| Construction | 17 Yrs |
| Pipelay Vessels | 17 Yrs |
| Offshore Pipelines | 17 Yrs |
| Lifting Barge | 17 Yrs |
| Subsea | 17 Yrs |
Additional Employment Documents
| Document |
|---|
| None specified |

