Terminal/Refinery/Distribution (Refinery Operations) positions sought by Candidate #31921473 from Batangas, Philippines
Looking For
| Terminal/Refinery/Distribution > Refinery Operations |
|---|
Job Requirements
| Item | Value |
|---|---|
| Min Salary: | £100000 |
| Min Day Rate: | £300 |
| Willing to Work: | Site Offshore |
| Will Accept: | Short Term Contract Long Term Contract |
| Country of Residence: | PH |
| Authorised to Work: |
South Africa Malaysia Cuba United Kingdom UAE Mexico Australia Brazil |
| Desired Location(s): |
Africa Asia Central America and the Caribbean Europe Middle East North America Oceana (Australia) South America |
| Countries Candidate Doesn't Wish To Work In: | None specified |
Qualifications
| Qualification | Gained |
|---|---|
| Bachelors Degree or equivalent | 1973 |
Languages
| English |
|---|
Employment History
Hover job titles for more details.
Current position available after purchase and to Unlimited recruiters. Upgrade now.
Pre-commissioning Supervisor (Sep 08 - Apr 10)
Sep 2008 - Apr 2010
Saudi Arabian Bechtel Company (SABCO)
Saudi Arabia > Jubail
Engineering: Commissioning/Pre-commissioning
Ensure that all pre-commissioning activities are carried out safely and as per specific procedures. Witness pre-commissioning inspections and testing. Review pre-commissioning documentation.
Commissioning Supervisor (May 07 - Apr 08)
May 2007 - Apr 2008
Toyo Engineering Corporation (TEC)
Iran > Tehran
Engineering: Commissioning/Pre-commissioning
Supervise pre-commissioning / commissioning activities in the Gas Treating Plant. Perform Final-Walk-Through inspection of the Gas Plant Complex together with the client.
Process Operator (Jul 04 - Jan 07)
Jul 2004 - Jan 2007
South Pars Gas Company (SPGC)
Iran > Tehran
Operations (other): Process
Responsible for gas wells start-up / shutdown, well test, gas dehydration plant operation, monitoring and data gathering.
Production Operator (Feb 04 - Jun 04)
Feb 2004 - Jun 2004
Vintage Petroleum Incorporated (VPI)
Yemen > Sanaa
Operations (other): Production
Responsible for oil wellhead operation, separators, storage tanks (loading/off-loading) and transfer pumps in the oil plant.
Commissioning Supervisor (Feb 03 - Sep 03)
Feb 2003 - Sep 2003
Japan Gas Corporation (JGC)
Algeria > Skikda
Engineering: Commissioning/Pre-commissioning
Supervise pre-commissioning / commissioning, start-up / shutdown of new equipments and installations in the Gas Treating Plant.
Production Operator (Nov 00 - Dec 02)
Nov 2000 - Dec 2002
Total Petroleum
Yemen > Sanaa
Operations (other): Production
Responsible for the operation of oil wells, start-up / shutdown, normal operation of the oil plant and product transfer to oil gathering station.
Production Operator (Dec 99 - Sep 00)
Dec 1999 - Sep 2000
National Iranian Oil Company
Iran > Tehran
Operations (other): Production
Responsible for the operation of oil, gas, water wells, shutdown / start-up of process plants and related facilities onshore or offshore.
Production Operator (Dec 98 - Aug 99)
Dec 1998 - Aug 1999
Petroleum Development Oman
Oman > Muscat
Operations (other): Production
Responsible for pre-commissioning / commissioning, start-up / shutdown and normal operation of the gas treating plant.
Safety Assistant (Dec 97 - May 98)
Dec 1997 - May 1998
Abu Dhabi National Oil Company
United Arab Emirates > Abu Dhabi
Health & Safety: HSE
Responsible for gas testing, permit coordination, and inspection of Fire and Safety equipments in the process areas.
Production Operator (Aug 95 - Nov 97)
Aug 1995 - Nov 1997
Abu Dhabi National Oil Company
United Arab Emirates > Abu Dhabi
Operations (other): Production
Responsible for pre-commissioning / commissioning, start-up / shutdown and normal operation of the gas treating plant.
Control Operator (Sep 89 - May 95)
Sep 1989 - May 1995
Caltex Refinery, Philippines
Philippines > Batangas
Operations (other): Control Room Operations
Responsible for the operation of control instruments during start-up / shutdown and normal run of the process plants.
Production Operator (Jul 86 - Aug 89)
Jul 1986 - Aug 1989
Caltex Refinery, Philippines
Philippines > Batangas
Operations (other): Process
Responsible for the field operation, shutdown / start-up, emergency, upset and normal run of the process plants.
Technical Clerk (Aug 80 - May 86)
Aug 1980 - May 1986
Saudi Consolidated Electric Company
Saudi Arabia > Dammam
Engineering: Electrical
Responsible for maintaining the Technical Library of the company.
Purchaser (Jan 76 - Jun 80)
Jan 1976 - Jun 1980
Vicor Construction Company
Philippines > Batangas
Supply Chain/Procurement: Buyer/Purchasing
Responsible for maintaining the construction supplies of the company.
Availability
| Item | Value | |
|---|---|---|
|
Notice Required: 1 weeks Available from: 12/02/2012 |
||
Training & Certification
| Qualification | Gained/Expired |
|---|---|
| Permit To Work (PTW) | |
| HSE Induction Training | |
| Basic Fire Fighting | |
| Gas Tester Training | |
| H2S & Breathing Apparatus Training | |
| Helicopter Underwater Escape Training | |
| Basic Offshore Safety & Emergency Training | |
| Standard First Aid | |
| Training Transcript | |
| Training Transcript | |
| Training Transcript | |
| Training Transcript | |
| Training Transcript |
Industry Experience
| Industry Area | Experience |
|---|---|
| Terminal/Refinery/Distribution - Refinery Operations | 8 Yrs |
| Supply Chain/Procurement - Buyer/Purchasing | 4 Yrs |
Project Experience
| Project Type | Experience |
|---|---|
| Oil Refinery | 8 Yrs |
| Production Platforms | 3 Yrs |
| Gas Plant | 3 Yrs |
Additional Employment Documents
| Document |
|---|
| Additional Document |
| Additional Document |

