Engineering (Controls) positions sought by Candidate #18666461 from United States
Looking For
| Engineering > Controls |
|---|
| Engineering > Proposals |
| Design > Electrical and Instrument |
| Sales/Marketing > Technical Sales |
Job Requirements
| Item | Value |
|---|---|
| Min Salary: | £60000 |
| Min Day Rate: | £620 |
| Willing to Work: | Site Office International |
| Will Accept: | Short Term Contract |
| Country of Residence: | US |
| Authorised to Work: | USA |
| Desired Location(s): |
Egypt USA Canada |
| Countries Candidate Doesn't Wish To Work In: | None specified |
Qualifications
| Qualification | Gained |
|---|---|
|
Bachelors Degree or equivalent BSEE |
1969 |
| Professional Engineer or equivalent |
Languages
| English |
|---|
Employment History
Hover job titles for more details.
Current position available after purchase and to Unlimited recruiters. Upgrade now.
Applications Engineer (Mar 10 - Jun 10)
Mar 2010 - Jun 2010
Contract employee
United States > Ohio
Engineering: Controls
Updated the controls and graphics (TPS, with heavy CL applications) at an edible oils plant. Specified, prepared order for and installed new TPS hardware.
Principle (Nov 09 - Nov 09)
Nov 2009 - Nov 2009
Process Solutions Consulting, LLC
Egypt > Hurghada
Engineering: Controls
designed and implemented the Honeywell TPS interface for a new APC package in a polypropylene plant
System Architect / Solution Consultant (Mar 01 - Aug 09)
Mar 2001 - Aug 2009
Honeywell Process Solutions
United States
Sales/Marketing: Sales Engineer
Developed technical solutions on $400M of global mega-project MAC pursuits in 8 years. Worked with Account Managers to refine and enhance the sales strategy, worked with estimators to produce a compliant and cost-competitive compliant proposal. Part of team that developed Honeywell’s Integrated Main Automation Contractor (integrated MAC) approach. Initiated and led Honeywell’s automation sys...
Lead System / Application Engineer (Mar 99 - Feb 01)
Mar 1999 - Feb 2001
Honeywell
United States > Texas
Engineering: Commissioning/Pre-commissioning
Provided technical direction to team which migrated old ABB controls to Honeywell TPS system on an ethylene plant. Re-implemented old ABB complex control schemes in TDC. Developed and implemented complex loop documentation standard. Recruited several key team members to enhance the team’s capabilities.
Lead System / Application Engineer (May 98 - Feb 01)
May 1998 - Feb 2001
Honeywell
United States
Engineering: Controls
Built and led team which delivered two multi-million expansion projects destined for Saudi Arabia, on time and on budget.Designed and implemented all subsystem interfaces, all advanced regulatory controls and startup/shutdown procedures. Consultant to industry marketing group.
Principle System Engineer (Dec 97 - May 98)
Dec 1997 - May 1998
Honeywell
United Kingdom > Reading
Engineering: Controls
Led the applications and subsystem interfaces portion of a Front End Engineering Design (FEED) effort for a $50M project. Worked with customer and consulting engineering company to define system structure and write specifications for sub-vendors and other suppliers. System included industrial strength ATM network, approximately 80 NT nodes with application software from 10 different sources.
Chief Engineer (Jul 96 - Nov 97)
Jul 1996 - Nov 1997
Honeywell
United States
Engineering: Controls
Led team that designed and delivered $33M Honeywell DCS system for a Gas Plant expansion system project on time.
DCS Startup Engineer (Jul 95 - Jul 96)
Jul 1995 - Jul 1996
Honeywell
Saudi Arabia > Jubail
Engineering: Commissioning/Pre-commissioning
Installed, commissioned, started up and gained customer acceptance of a $23M system in Saudi Arabia, including seven non-Honeywell subsystems, all regulatory controls and all advanced applications. Spent a considerable portion of time training and mentoring key Saudi personnel. Worked with Saudi plant management daily.
Lead System & Application Engineer (Aug 93 - Nov 94)
Aug 1993 - Nov 1994
Honeywell
United States
Engineering: Controls
Lead control engineer on a $23 system modernization project for Saudi Arabia. Led the team that migrated the applications from an old main frame computer system to a 57 node Honeywell TDC 3000 DCS system. Redesigned many of the applications to take advantage of the new architecture, including the regulatory and advanced controls, subsystem interfaces, operator graphics, historization, jou...
System Consultant (Feb 91 - Aug 93)
Feb 1991 - Aug 1993
Honeywell
Saudi Arabia > Al Khobar
Sales/Marketing: Sales Engineer
Provided In-Kingdom technical support to the sales team. Provided hardware, software and applications/systems support to large onshore and offshore oil and gas production and gas plants. Provided consulting services to with customer's engineering staff to assure that their standards reflected the current state of the art in systems design. Regularly provided technical assistanc...
Senior Project Manager, International Operations (Jun 88 - Jan 91)
Jun 1988 - Jan 1991
Honeywell
United States
Engineering: Controls
Built and managed a projects group that built, configured and delivered Honeywell distributed control systems primarily to Korea, Singapore and China. Responsible for meeting all contractual and schedule commitments, customer satisfaction, staffing and managing project costs.
Senior Principle Application Engineer (Aug 80 - May 88)
Aug 1980 - May 1988
Honeywell
United States
Engineering: Controls
Led teams of engineers and support personnel that designed, implemented and installed advanced applications. Directed the system installation and commissioning. Tracked project scope and managed scope changes. Lead Application/System Engineer of Honeywell’s first Total Distributed Control System & the first Industrial Utilities Management System. Projects included industrial ...
Availability
| Item | Value | |
|---|---|---|
|
Notice Required: 2 weeks Available from: 18/02/2012 |
||
Training & Certification
| Qualification | Gained/Expired |
|---|---|
| None specified | |
Industry Experience
| Industry Area | Experience |
|---|---|
| Engineering - Controls | 30 Yrs |
| Sales/Marketing - Sales Engineer | 10 Yrs |
| Management - Consultant | 10 Yrs |
Project Experience
| Project Type | Experience |
|---|---|
| Project support | 30 Yrs |
| Construction | 10 Yrs |
| Gas Plant | 10 Yrs |
| Desert Projects | 10 Yrs |
| Non Oil and Gas | 8 Yrs |